Maintenance Requests
Track and manage property maintenance
3
Open
2
Emergency
3
In Progress
2
Completed
All Requests
8 requests
| ID | Location | Category | Description | Priority | Status | Assigned To | Created | Est. Cost |
|---|---|---|---|---|---|---|---|---|
| MR-001 | Room 203 - Bathroom | Plumbing | Major water leak from ceiling above shower. Water dripping steadily and spreading to bedroom area. Needs immediate containment and repair. | EMERGENCY | IN PROGRESS | MT Mike Torres | Apr 10, 2026 | $850.00 |
| MR-002 | Floor 3 - Hallway | Electrical | Exposed wiring near fire exit door. Potential shock hazard for guests. Emergency lighting circuit affected. | EMERGENCY | OPEN | DC Dave Chen | Apr 10, 2026 | $400.00 |
| MR-003 | Room 305 - Main area | HVAC | AC unit making loud rattling noise and blowing warm air. Guest complained of inability to sleep. Unit may need compressor replacement. | HIGH | OPEN | LR Luis Ramirez | Apr 9, 2026 | $1,200.00 |
| MR-004 | Room 102 - Bedroom | Furniture | Bed frame cracked on one side causing mattress to sag. Guest reported back pain. Needs replacement frame. | HIGH | OPEN | Unassigned | Apr 9, 2026 | $350.00 |
| MR-005 | Room 401 - Entrance | Safety | Electronic door lock malfunctioning intermittently. Sometimes fails to lock after closing. Security concern. | HIGH | IN PROGRESS | DC Dave Chen | Apr 9, 2026 | $275.00 |
| MR-006 | Lobby - Reception area | Cosmetic | Water stain on ceiling tile above front desk. Roughly 2x3 feet. Tile needs replacement and source leak inspection. | MEDIUM | IN PROGRESS | SK Sarah Kim | Apr 8, 2026 | $180.00 |
| MR-007 | Room 206 - Bathroom | Plumbing | Slow drain in bathtub. Takes over 10 minutes to fully drain. Likely hair/debris clog. | LOW | COMPLETED | MT Mike Torres | Apr 8, 2026 | $75.00 |
| MR-008 | Room 304 - Bedroom | Cosmetic | Small patch of peeling wallpaper near window. Approximately 6 inches. Cosmetic only, no structural issue. | LOW | COMPLETED | JP Jenny Park | Apr 7, 2026 | $45.00 |